Industrial PM in the field
How a mining operation in the Andes recovered 36 h on a SAG mill shutdown
A mine in southern Peru ran three consecutive shutdowns at 84 h against a 48 h plan. Here is how we found and eliminated 36 h of invisible dead time.
EN
PMP® from the trenches
Date Change With 2 Days' Notice: How to Document and Recover the Real Field Impact
The client gave 2 days' notice, not 10. Staff was already committed elsewhere. Here's how to build the impact file and make the charge stick.
EN
Primavera P6 in practice
Project Tracking Dashboard: Integrating Primavera P6 with Fastify and React
How I pull live data from Primavera P6 and surface it in a React+Vite dashboard backed by Fastify+TS. Architecture, endpoints, and hard-won field lessons.
EN
Industrial PM in the field
Cutting the shutdown window down to 36 hours
A PLC migration at SMCV taught us that the shutdown schedule is won or lost in the first 6 hours.
EN
Primavera P6 in practice
Parametric WBS with Primavera P6
How to build a WBS that survives scope changes without rewriting the schedule every time.